January 2025 Update

B33008CF-F7F2-4843-9E65-DCBDD6327707.jpeg
61127CE1-F505-438C-8C74-F247FDAB3939.jpeg

• AREA E FLOOR SLAB POUR IS SCHEDULED TO BE COMPLETED SOON.
•INSULATED CONCRETE FORM FORMING IS SCHEDULED TO BE COMPLETED SOON.
•INSULATED CONCRETE FORM LIFT IS SCHEDULED TO BEGIN AFTER FORMING.