January 2025 Update


•AREAS B AND C STRUCTURAL STEEL ERECTION IS SCHEDULED TO BE COMPLETED SOON.
•AREA A GRADE BEAM FORM CONCRETE POURS ARE SCHEDULED TO BE COMPLETED SOON.
•AREA B FLOOR CONCRETE POURS ARE SCHEDULED TO BE COMPLETED SOON.
•AREAS B AND C ROOF DECKING WORK IS
•SCHEDULED TO BE COMPLETED SOON.
•BUILDING INTERIOR FRENCH DRAINING INSTALLATION IS SCHEDULED TO BE COMPLETED SOON.
•FRONT RAMP FORMING AND CONCRETE POURS ARE SCHEDULED TO BE COMPLETED SOON.
•EXISTING 3” DOMESTIC WATER LINE RELOCATION IS SCHEDULED TO BE COMPLETED SOON.
•AREA A FLOOR CONCRETE POURS ARE SCHEDULED TO BEGIN SOON.
•AREA C INSULATED CONCRETE FORM SECOND LIFT IS SCHEDULED TO BEGIN SOON.